School builder | Academic builder | Consigli Tue, 20 Aug 2024 16:47:10 +0000 en-US hourly 1 https://wordpress.org/?v=6.6.1 László Z. Bitó Music Conservatory Building /project/laszlo-z-bito-music-conservatory-building/ Thu, 25 May 2017 21:19:12 +0000 http://162.211.83.227/?post_type=project&p=7807 Bard College received a generous gift from its alumnus, physiologist and writer László Z. Bitó, to construct a state-of-the-art music teaching and performance facility. The new 17,000 sq. ft. László Z. Bitó ’60 Conservatory Building houses 15 learning studios, a teaching classroom and an intimate performance space that is equipped… More >

The post László Z. Bitó Music Conservatory Building appeared first on Consigli Construction.

]]>
Bard College received a generous gift from its alumnus, physiologist and writer László Z. Bitó, to construct a state-of-the-art music teaching and performance facility. The new 17,000 sq. ft. László Z. Bitó ’60 Conservatory Building houses 15 learning studios, a teaching classroom and an intimate performance space that is equipped with the latest audio and video recording and live-streaming technology.

The 2,400 sq. ft. performance space is the centerpiece of the facility. Its seating for up to 145 people can be reconfigured to accommodate a variety of events. Our in-house Millwork Shop installed custom-fabricated millwork paneling, which is now the venue’s architectural hallmark, both visually and acoustically.

The building’s modern, curving façade and upswept roof line, accented with both glass and natural wood detailing, evokes the artistic creativity of Bard’s liberal and performing arts education programs.

The post László Z. Bitó Music Conservatory Building appeared first on Consigli Construction.

]]>
McMullen Museum of Art & University Conference Center /project/mcmullen-museum-art-university-conference-center/ Thu, 13 Apr 2017 17:57:03 +0000 /?post_type=project&p=6749 In 2004, Boston College acquired property once owned by the Archdiocese of Boston, and elected to transform the former Cardinal’s residence into a museum and conference center on its Brighton campus. The re-purposed facility includes a 7,310 sq. ft. curtain wall-clad addition, which serves as the new entrance and lobby;… More >

The post McMullen Museum of Art & University Conference Center appeared first on Consigli Construction.

]]>
In 2004, Boston College acquired property once owned by the Archdiocese of Boston, and elected to transform the former Cardinal’s residence into a museum and conference center on its Brighton campus. The re-purposed facility includes a 7,310 sq. ft. curtain wall-clad addition, which serves as the new entrance and lobby; the integration of new architectural features and mechanical systems; and landscaping to complement the updated facility.

Prior to the start of construction, we relocated gas and utility lines located within the footprint of the addition. The updated ground and first floors of this former residence provide conference and administrative space, featuring the integration of high-tech audio/visual systems, while preserving the original historic finishes such as intricate millwork and marble flooring. The upper floors were transformed into galleries, framing rooms, art preparation and administrative space, which required robust HVAC, lighting and humidity controls to maintain the collections.

The post McMullen Museum of Art & University Conference Center appeared first on Consigli Construction.

]]>
Central Heating Plant Upgrade & Expansion /project/central-heating-plant-upgrade-expansion/ Tue, 08 Sep 2020 22:00:57 +0000 /?post_type=project&p=12724 Project Overview Expansion of a 24/7 live heating plant serving nearly two dozen campus buildings with high-pressure steam Migration of existing equipment exhaust from the original steam tower to the new Construction in the heart of the occupied academic campus with significant pedestrian and vehicular traffic Boston College’s existing five-story… More >

The post Central Heating Plant Upgrade & Expansion appeared first on Consigli Construction.

]]>
Project Overview
  • Expansion of a 24/7 live heating plant serving nearly two dozen campus buildings with high-pressure steam
  • Migration of existing equipment exhaust from the original steam tower to the new
  • Construction in the heart of the occupied academic campus with significant pedestrian and vehicular traffic

Boston College’s existing five-story Central Heating Plant operates and maintains three high-pressure steam boilers providing service for up to 22 campus buildings. The expansion project included the construction of a new addition connected to the existing live plant to house two new boilers. Additionally, the existing boiler exhaust chimney was dismantled and two of the existing boilers were migrated to exhaust out of a newly constructed exhaust stack erected atop the new structure. Other equipment installed included a new 13.8 kilowatt (kW) switchgear, emergency generator, AHU, VRF system and a fuel storage system.

Construction of the steel-framed addition required deep excavation work and support of excavation (SOE) with both water and sewer lines being routed around the footprint. Enabling work included the relocation of an emergency backup generator, transfer gear, fuel storage tank and a storage building removal. Safety hazard mitigation was a key focus in pre-construction and throughout the project, as the addition was being completed while the heating plant was fully occupied by the plant facility staff. Additionally, the project site was located in the heart of the occupied academic campus with over 14,000 students being routed around the site daily, requiring vehicular and pedestrian re-routing plans and communication.

The post Central Heating Plant Upgrade & Expansion appeared first on Consigli Construction.

]]>
Patrick Cadigan Center for Academic Excellence /project/patrick-cadigan-center-academic-excellence/ Thu, 13 Apr 2017 18:24:12 +0000 /?post_type=project&p=6758 Founded in 1863, BC High School is an all-male Jesuit school for 1,500 students grades 7-12. In order to revitalize an aging classroom building, we constructed a new 30,000 sq. ft. addition and completed the renovation of surrounding areas within the existing building. The new addition houses art facilities, music… More >

The post Patrick Cadigan Center for Academic Excellence appeared first on Consigli Construction.

]]>
Founded in 1863, BC High School is an all-male Jesuit school for 1,500 students grades 7-12. In order to revitalize an aging classroom building, we constructed a new 30,000 sq. ft. addition and completed the renovation of surrounding areas within the existing building. The new addition houses art facilities, music classrooms, a drama performance studio, academic classrooms, group instructional theater and a gymnasium.

The addition’s striking two-story glass atrium and curtain wall façade overlooks playfields and Boston Harbor, creating an indoor/outdoor transitional space for students and alumni.

Extensive logistical planning was required to complete work on this active campus, which is adjacent to operational athletic fields and busy student pathways. Our self-perform work included the building’s siding for this green/sustainable project,  which is pursuing LEED Silver certification.

The post Patrick Cadigan Center for Academic Excellence appeared first on Consigli Construction.

]]>
Kilachand Hall /project/bukilachand-hall/ Fri, 19 Jan 2024 18:29:36 +0000 /?post_type=project&p=18187 Renovation and restoration of Kilachand Hall, a nine-story historic residence hall in the heart of BU’s urban campus that also serves as the home for the Kilachand Honors College. Originally built in the 1920s as a hotel and converted to a residence hall in the 1960s, the scope of work… More >

The post Kilachand Hall appeared first on Consigli Construction.

]]>
Renovation and restoration of Kilachand Hall, a nine-story historic residence hall in the heart of BU’s urban campus that also serves as the home for the Kilachand Honors College. Originally built in the 1920s as a hotel and converted to a residence hall in the 1960s, the scope of work included significant façade upgrades, installation of new elevators and egress stairs, complete lobby and bathroom renovations and the transformation of the ninth floor into a multi-purpose collaboration and function space overlooking the Charles River. The entire ninth floor was demolished down to its steel frame and rebuilt with several structural modifications.

Extensive exploratory work was completed during the summer months leading up to the start of the renovations. During this time, multiple crews conducted reviews of the building’s windows, lintels and façade, utilizing a full scaffolding system. Additionally, multiple test pits were dug to confirm location and elevation of existing utilities as well as drain connection and inverts around the building. On the interior, each dorm room and bathroom was evaluated to coordinate exhaust upgrades and improvements.

The project was designed and built to LEED Gold certification per LEED v4 standards and features a new stormwater recharge system.

The post Kilachand Hall appeared first on Consigli Construction.

]]>
John and Lile Gibbons Center for Arctic Studies & Barry Mills Hall /project/john-and-lile-gibbons-center-for-arctic-studies-barry-mills-hall/ Tue, 28 Feb 2023 15:13:26 +0000 /?post_type=project&p=16243 Bowdoin College (Bowdoin) constructed a new state-of-the-art facility dedicated to the broad study of the Arctic consisting of two mass timber buildings—the Center for Arctic Studies and Mills Hall—connected underground by a utility/pedestrian tunnel. The Center for Arctic Studies is critical to Bowdoin’s multidisciplinary teaching and study of the Arctic… More >

The post John and Lile Gibbons Center for Arctic Studies & Barry Mills Hall appeared first on Consigli Construction.

]]>

Bowdoin College (Bowdoin) constructed a new state-of-the-art facility dedicated to the broad study of the Arctic consisting of two mass timber buildings—the Center for Arctic Studies and Mills Hall—connected underground by a utility/pedestrian tunnel. The Center for Arctic Studies is critical to Bowdoin’s multidisciplinary teaching and study of the Arctic and the environment, featuring teaching and laboratory spaces for collaborative work among students, faculty and researchers. The Center will also house galleries and support spaces for the College’s Peary-MacMillan Arctic Museum, to be relocated from its current campus location. Mills Hall, largely dedicated to academic program areas, will host classrooms and faculty offices, including a 60-seat cinema classroom. The classrooms are designed to facilitate active learning and the use of new and evolving technologies. The building also includes an event space accommodating 288 seated guests.

To confirm schedule and cost equivalence, Consigli completed a 4D structural erection schedule analysis and cost analysis of the timber structure against other structural options, including steel and concrete. All work was managed in the heart of Bowdoin’s active, occupied campus. While 68 trees were removed from the project site, 85 trees better adapted to Maine’s changing climate were planted at project completion.

The post John and Lile Gibbons Center for Arctic Studies & Barry Mills Hall appeared first on Consigli Construction.

]]>
The Stanley Manne ’52 Institute /project/the-stanley-manne-52-institute/ Fri, 14 Jul 2023 19:26:27 +0000 /?post_type=project&p=16926 With a generous gift from alumnus Stanley Manne ‘52, the Bronx High School of Science built an 11,000 sq. ft., 72-seat, two-story, new state-of-the-art research facility with a focus on life sciences. The building provides college level laboratory facilities for advanced students to carry out long-term personal research projects under… More >

The post The Stanley Manne ’52 Institute appeared first on Consigli Construction.

]]>
With a generous gift from alumnus Stanley Manne ‘52, the Bronx High School of Science built an 11,000 sq. ft., 72-seat, two-story, new state-of-the-art research facility with a focus on life sciences. The building provides college level laboratory facilities for advanced students to carry out long-term personal research projects under the direction of a faculty advisor, representing the most transformative improvement in the school’s history. The institute features three multidisciplinary labs and a full complement of auxiliary spaces: a cold room, tissue culture room, microscopy room, sterilization room, animal room and more. The new labs enable students to conduct independent scientific research with cutting-edge equipment and materials in sophisticated, versatile spaces for their research. Students will have the freedom to envision, design, execute, analyze and report on projects. The students can run experiments, continuously allowing them to undertake more complex research questions.

The post The Stanley Manne ’52 Institute appeared first on Consigli Construction.

]]>
Brooke Charter High School /project/brooke-charter-high-school/ Mon, 27 Mar 2017 17:09:39 +0000 /?post_type=project&p=6124 Brooke Charter Schools’ mission is to provide academically rigorous public education to Boston-area students. The new 94,000 sq. ft. Brooke Charter High School builds on that mission by providing a state-of-the-art learning environment for one of Boston’s most underprivileged neighborhoods. The site adjacent to the existing high school was chosen… More >

The post Brooke Charter High School appeared first on Consigli Construction.

]]>
Brooke Charter Schools’ mission is to provide academically rigorous public education to Boston-area students. The new 94,000 sq. ft. Brooke Charter High School builds on that mission by providing a state-of-the-art learning environment for one of Boston’s most underprivileged neighborhoods. The site adjacent to the existing high school was chosen for the new building—which contained significant amounts of contaminated soils and ledge that needed to be removed. Due to of its close proximity to the school and dense urban neighborhood, our team was heavily engaged in community outreach and mitigation measures throughout the project.

The new Brooke Charter High School supports 840 students in grades 8-12 and features classrooms, a dining commons, study rooms, a gymnasium, auditorium, music and art rooms and administrative staff offices. The school was built to LEED for Schools Silver standards.

The post Brooke Charter High School appeared first on Consigli Construction.

]]>
Ashburn Chapel /project/ashburn-chapel/ Thu, 13 Apr 2017 18:16:55 +0000 /?post_type=project&p=6755 In an effort to accommodate their entire student body for services, Brooks School engaged our firm to renovate and expand Ashburn Chapel—the significant and historic heart of the campus—to fit the entire school without changing the character of the building. Along with Goody Clancy as our design-build partner, we worked… More >

The post Ashburn Chapel appeared first on Consigli Construction.

]]>
In an effort to accommodate their entire student body for services, Brooks School engaged our firm to renovate and expand Ashburn Chapel—the significant and historic heart of the campus—to fit the entire school without changing the character of the building. Along with Goody Clancy as our design-build partner, we worked with Brooks School through a six month pre-construction process, adjusting and reconfiguring interior walls in the basement floor slabs to test-fit the new design.

The final design resulted in a six month construction process starting in June after the students left for summer break, which included lowering the basement floor slab by two feet and underpinning the existing foundations to create bright student program spaces from the dark, cramped and underutilized basement of the original building.

Major changes at the Chapel level included the renovation of the existing Fiske organ and the re-orientation of the pews to align with the altar and nave space. In addition to the architectural redesign, a new LED controllable lighting system and a state-of-the-art AV system was installed in the space.

Our team also worked with Brooks and Andrew Lenard Design, the landscape architect, to create a new entrance drive and interior roadway on the backside of the building to support the master plan of pedestrianizing the main street of campus.

The post Ashburn Chapel appeared first on Consigli Construction.

]]>
Center for the Arts /project/center-for-the-arts/ Fri, 02 Jun 2017 16:58:36 +0000 http://162.211.83.227/?post_type=project&p=8006 The academically prestigious Brooks School has demonstrated its dedication to the arts with the construction of the new Center for the Arts. The building is centrally located in the heart of campus and consists of three interconnected structures: one each for performance, music and visual arts. A 387-seat performance theater,… More >

The post Center for the Arts appeared first on Consigli Construction.

]]>
The academically prestigious Brooks School has demonstrated its dedication to the arts with the construction of the new Center for the Arts. The building is centrally located in the heart of campus and consists of three interconnected structures: one each for performance, music and visual arts. A 387-seat performance theater, designed to fit the entire student body, connects to a 1,200 sq. ft. black box theater, which serves as flexible teaching space and an additional performance venue. The music portion of the building includes rehearsal and ensemble spaces, a choir room and four practice rooms, as well as a recording studio. The visual arts section features ample studio space for ceramics, 2D/3D art and photography with a darkroom and digital media lab. The studios boast floor-to-ceiling-windows for natural light and campus views with an opening to an exterior Arts Terrace and the new campus quad.

Our team worked collaboratively with Brooks School and Ann Beha in an extensive pre-construction and value engineering phase to bring the project within budget. The project utilized a design-assist approach and incorporated early feedback from key subcontractors on the M/E/P systems and curtain wall. The finished building features an eclectic mix of materials such as stained concrete floors, exposed wood ceilings and exterior wood siding complimented with metal siding and roofing. The scope also included the demolition and installation of a new steam line and upgrades to the chiller plant.

The post Center for the Arts appeared first on Consigli Construction.

]]>